Serving California, Oregon, Arizona, Nevada | BCM Construction
Large industrial printing facility, the walls were actually the tallest concrete walls in Nevada for a while at 57.5 feet. In addition to the building shell, BCM built foundations for heavy equipment and HVAC ducts as large as 6 feet in diameter.
Location: Fernley, NV
Dollar value: $12,000,000
Square footage: 400,000 sq ft
Time frame: 7 months